CONSTRUCTION STAGE 1
Stage 1 (2020-2025): Construction of 4 general cargo berths
for ships of up to 100,000 DWT. Including a cargo berth for
loading and unloading machinery and equipment, for
construction of domestic factories in the Southeast Economic
Zone and the region.
CONSTRUCTION STAGE 2
Stage 2 (2026-2031): Construction of 3 more general cargo
berths for ships of up to 100,000 DWT. Completion of the
Southern breakwater and dredge open water for 3 additional
berths.
CONSTRUCTION STAGE 3
Stage 3 (2032-2036): Construction of the last 3 berths for
ships of up to 100,000 DWT. These 3 berths are designed for
ships of up to 100,000 DWT in cargo handling. Completion of
breakwaters and dredging for these additional berths.